Latest from our Blog
November 15, 2024
Digital twin modeling creates detailed virtual representations of physical assets, systems, or processes. They enable manufacturers to simulate and analyze operations in real time. Utilizing 3D models facilitates more informed decision-making, increasing efficiency and reducing downtime.
Erica Smith |
November 15, 2024
November 15, 2024
Industrial Engineering Consulting improves processes, systems, and operations within organizations to boost efficiency and productivity. This approach analyzes workflows, optimizes resource allocation, and implements strategies that reduce waste, lower costs, and enhance overall performance.
Erica Smith |
November 15, 2024
Upcoming Webinars
M, 2024
Latest Case Studies
- Date
- April 20, 2024
PMC utilized SDS2 to generate a comprehensive model, delivering GA drawings, assembly and part drawings, along with bolt lists for a project totaling 35 tons.- Date
- April 20, 2024
PMC provided a 3D model in SDS/2, GA drawings, assembly and part drawings, as well as NC and DXF files, along with bolt lists to our client. 125 ton project.- Date
- October 31, 2023
PMC specializes in providing high-volume scanning services for a diverse range of clients, including fast-food chains, fast-casual establishments, cafes, and food markets. Despite the competitive nature of this sector, PMC has secured exclusive contracts for scanning thousands of these locations.
Latest Projects
- Date
- August 20, 2024
PMC’s expert team was brought in by the largest multi-spindle rotary cutter and tractor implement manufacturer in the country to tackle significant issues.- Date
- August 20, 2024
PMC’s expert team was brought in by the largest multi-spindle rotary cutter and tractor implement manufacturer in the country to tackle significant issues.- Date
- June 14, 2024
A global leader in heavy machinery and technology enlisted our skilled BIM modeling team to develop a detailed 3D model using point clouds from their internal laser scanning team. Our team meticulously performed quality control measures to ensure the point clouds were suitable for modeling.
Latest Whitepapers
- Date
- October 6, 2023
Marcelo Zottolo Edward Williams Production Modeling Corporation Suite 1006 Parklane Towers West Three Parklane Boulevard Dearborn, Michigan 48126 U.S.A. {mzottolo|ewilliams}@pmcorp.com KEYWORDS Manufacturing simulation, scenario analysis. ABSTRACT […]- Date
- October 6, 2023
Improvement of Material Flow, Work Apportionment, and Equipment Usage Julio Pérez, Gabriel Carreño, Ozge Çivit Simulation Analysis PMC Dearborn, Michigan, USA {e-mail: jperez, gcarreno, ocivit}@pmcorp.com Edward […]- Date
- September 27, 2023
Marcelo Zottolo Edward J. Williams PMC 15726 Michigan Avenue Dearborn, Michigan 48126, U.S.A. Onur M. Ülgen 2310 Engineering Complex University of Michigan – Dearborn 4901 Evergreen […]