PROJECT SUMMARY The client is a leading global supplier of automotive dampers and performance shock absorbers in commercial and defense segments. PMC was able to offer […]
Stephanie Sobieski | July 5, 2021
PMC utilized SDS2 to generate a comprehensive model, delivering GA drawings, assembly and part drawings, along with bolt lists for a project totaling 35 tons.
Erica Smith | April 20, 2024
PMC provided a 3D model in SDS/2, GA drawings, assembly and part drawings, as well as NC and DXF files, along with bolt lists to our client. 125 ton project.
PMC specializes in providing high-volume scanning services for a diverse range of clients, including fast-food chains, fast-casual establishments, cafes, and food markets. Despite the competitive nature of this sector, PMC has secured exclusive contracts for scanning thousands of these locations.
Joydeep Chatterjee | October 31, 2023
PROJECT SUMMARY The client, a major automotive company, desired a new vehicle distribution system for its North American dealership network. The goal was to create a […]
Stephanie Sobieski | June 30, 2021
PROJECT SUMMARY A top tier supplier of agricultural and construction equipment launched several new products without developing corresponding labor standards to support the production process. This […]
Stephanie Sobieski | June 29, 2021
PROJECT SUMMARY PMC’s established project management methodology was used to design, plan and implement material handling systems for a new engine assembly line at a large automotive engine […]
PROJECT SUMMARY The client is a multinational conglomerate that focuses on industrial engineering and steel production. PMC offered a discrete-event simulation model to evaluate the design of a new production […]
Stephanie Sobieski | June 27, 2021
PROJECT SUMMARY PMC was retained by a major automotive OEM to perform analyses of material flow within an integrated stamping and sub-assembly plant. The OEM not only wanted […]
Stephanie Sobieski | June 16, 2021
Project Summary A large discount retailer was preparing to incorporate a demand-driven scheduling system. A key parameter required for this system was accurate workload content by […]
Stephanie Sobieski | June 9, 2021
Project Summary A major optical retailer was concerned with their scheduling method, based primarily on sales dollars. They were interested in developing a more accurate, nimble, […]
Stephanie Sobieski | June 8, 2021
PROJECT SUMMARY A hospital administration was planning the construction of a new hospital. The building architects determined the structure of the hospital to encompass four departments […]
PROJECT SUMMARY A major producer of baby-food products desired additional information about their existing bottling system and recommendations to improve production efficiency. To meet the client’s […]
Stephanie Sobieski | June 1, 2021
PROJECT SUMMARY This simulation model was developed to improve the existing production facilities for one of the world’s leading producers of ready-to-eat cereals. Plant management had […]
Stephanie Sobieski | May 10, 2021
Stephanie Sobieski | April 18, 2021
PROJECT SUMMARY A simulation model was built to evaluate the performance of an automatic warehousing system under different values of design parameters and operational policies. The automatic warehousing […]
Stephanie Sobieski | June 30, 2020
PROJECT SUMMARY PMC helped a major automaker design the layout of a parts warehouse. Using simulation, researchers determined the staffing levels that different proposed layouts needed to […]
PROJECT SUMMARY A healthcare products manufacturer wished to perform an unbiased time and motion analysis to compare the efficiency of two distinct methods of contrast media […]
PROJECT SUMMARY An airframe manufacturer sought to improve their throughput rate. Previously, they had been first-to-market with a particular airframe model, resulting in both a high […]
Stephanie Sobieski | June 29, 2020
PROJECT SUMMARY A multi-billion dollar automotive supplier was outgrowing its 1.6 million square foot warehouse. With time running out and customer demand increasing, they called upon […]